Construction and residential projects.
-
Transport projects.
-
Infrastructure projects.
-
Project design and project management.
-
Electrical power systems and communication facilities.
-
Logistics services.
-
Supply of facilities and state services.
-
Construction and construction of giant road and bridge projects in the most difficult conditions and areas.
-
Studies and designs of roads and bridges using international standards in this field.
-
Implementation of the methods using the latest mechanisms and equipment through the diversity and expertise owned by the company.
-
Production and manufacturing of raw materials using excellent and capable expertise.
-
Providing quality control services using the latest equipment.
-
Doing business related to the construction and construction of roads.
-
Implementation of industrial and mechanical renovation and restoration projects.
-
Implementation of irrigation, drinking water and sanitation projects.
-
Implementation of projects to build medical facilities and support services.
| Project Name | Place | Contract with |
Contract Amount ID |
Year Of Contracting | % Of Completion |
|
Implementation of the Zankoura Road Project towards old Ramadi-Hit Road Description of the work: It is a road length of 2200 m and width of 30 m, connect the highway through the old Ramadi-Hit road, the company received Acknowledgments from anbar Governorate. Duration time(180 days) |
Anbar | Anbar Governorate | 2,051,401,500 | 2013 | 100% |
|
The establishment of 12 weight stations in Salah al-Din and Anbar and the western intersection of Highway No. 1Description of work: is to protect the external and internal roads from the overloads of trucks. Duration time (250 days) |
Anbar, Salah al-Din | Roads and Bridges General Authority | 12,414,114,500 | 2013 | 100% |
|
Demolition and reconstruction of school (18 class) in Ramadi with furniture. Duration time (300 days) |
Anbar | Anbar Governorate | 1,571,425,500 | 2014 | 100% |
| Paving roads in the Tamim -Aldawajin Neighborhood. | Anbar | Anbar Municipality | 49,500,500 | 2013 | 100% |
| Paving roads in the Tamim -Alqadisiyah 1 Neighborhood. | Anbar | Anbar Municipality | 48,300,500 | 2013 | 100% |
|
Paving roads of new Ramadi entrance in Presidential palaces compound.
|
Anbar | Anbar Municipality | 49,814,900 | 2013 | 100% |
| Paving roads in the Alsharikah Neighborhood- Ramadi. | Anbar | Anbar Municipality | 46,850,900 | 2013 |
100%
|
| Paving roads in the 5 KM – Ramadi. | Anbar | Anbar Municipality | 49,760,900 | 2013 | 100% |
| Construction of 5 Star Hotel (G+14) – Ramadi | Anbar | Anbar Governorate | 57,856,200,000 | 2014 | In progress |
| Rehabilitation and Paving of Directorate of Health road. | Anbar | Anbar Municipality | 48,490,000 | 2017 | 100% |
| Rehabilitation and Paving of Alwatary road. | Anbar | Anbar Municipality | 43,400,000 | 2017 | 100% |
|
Rehabilitation and paving of the damaged streets and with Curbstone and the central and lateral sidewalks in Hit. Duration time (120 days). |
Anbar | Anbar Governorate | 559,762,000 | 2018 | 100% |
|
Implementation of middle carrot with lighting for Ramadi-Fallujah road. Duration time (120 days). |
Anbar | Anbar Governorate | 1,420,191,000 | 2018 | 100% |
| Ramadi – Fallujah road construction with a carrot and lighting | Anbar | Roads and Bridges General Authority | 1,384,080,000 | 2017 | 100% |
| Rehabilitation and paving street, in the city of Hit. | Anbar | Municipality of Hit | 557,762,000 | 2017 | 100% |
| Development and paving – Ramadi – Fallujah road, Section III | Anbar | Roads and Bridges General Authority | 875,500,000 | 2018 | 100% |