• Construction and residential projects.

  • Transport projects.

  • Infrastructure projects.

  • Project design and project management.

  • Electrical power systems and communication facilities.

  • Logistics services.

  • Supply of facilities and state services.

  • Construction and construction of giant road and bridge projects in the most difficult conditions and areas.

  • Studies and designs of roads and bridges using international standards in this field.

  • Implementation of the methods using the latest mechanisms and equipment through the diversity and expertise owned by the company.

  • Production and manufacturing of raw materials using excellent and capable expertise.

  • Providing quality control services using the latest equipment.

  • Doing business related to the construction and construction of roads.

  • Implementation of industrial and mechanical renovation and restoration projects.

  • Implementation of irrigation, drinking water and sanitation projects.

  • Implementation of projects to build medical facilities and support services.

Project Name Place Contract with

Contract Amount

ID

Year Of Contracting % Of Completion

Implementation of the Zankoura Road Project towards old Ramadi-Hit Road Description of the work: It is a road length of 2200 m and width of 30 m,  connect the highway through the old Ramadi-Hit road, the company received Acknowledgments from anbar Governorate.

Duration time(180 days)

Anbar Anbar Governorate 2,051,401,500 2013 100%

The establishment of 12 weight stations in Salah al-Din and Anbar and the western intersection of Highway No. 1Description of work: is to protect the external and internal roads from the overloads of trucks.

Duration time (250 days)

Anbar, Salah al-Din Roads and Bridges General Authority 12,414,114,500 2013 100%

Demolition and reconstruction of school (18 class) in Ramadi with furniture.

Duration time (300 days)

Anbar Anbar Governorate 1,571,425,500 2014 100%
Paving roads in the Tamim -Aldawajin Neighborhood. Anbar Anbar Municipality 49,500,500 2013 100%
Paving roads in the Tamim -Alqadisiyah 1 Neighborhood. Anbar Anbar Municipality 48,300,500 2013 100%

Paving roads of new Ramadi entrance in Presidential palaces compound.

 

Anbar Anbar Municipality 49,814,900 2013 100%
Paving roads in the Alsharikah Neighborhood- Ramadi. Anbar Anbar Municipality 46,850,900 2013

 

 

100%

 

Paving roads in the 5 KM – Ramadi. Anbar Anbar Municipality 49,760,900 2013 100%
Construction of 5 Star Hotel (G+14) – Ramadi Anbar Anbar Governorate 57,856,200,000 2014 In progress
Rehabilitation and Paving of Directorate of Health road. Anbar Anbar Municipality 48,490,000 2017 100%
Rehabilitation and Paving of Alwatary road. Anbar Anbar Municipality 43,400,000 2017 100%

Rehabilitation and paving of the damaged streets and with Curbstone and the central and lateral sidewalks in Hit.

Duration time (120 days).

Anbar Anbar Governorate 559,762,000 2018 100%

Implementation of middle carrot with lighting for Ramadi-Fallujah road.

Duration time (120 days).

Anbar Anbar Governorate 1,420,191,000 2018 100%
Ramadi – Fallujah road construction with a carrot and lighting Anbar Roads and Bridges General Authority 1,384,080,000 2017 100%
Rehabilitation and paving street, in the city of Hit. Anbar Municipality of Hit 557,762,000 2017 100%
Development and paving – Ramadi – Fallujah road, Section III Anbar Roads and Bridges General Authority 875,500,000 2018 100%